MTR eastern line automatic gate project

BII HK undertook the MTR eastern line automatic gate transformation project in 2012. The 385 gate machines along the project line, due to equipment aging, fail to meet daily business requirement with processing capacity and configuration. The transformation increases the user display interface to facilitate the user to operate, enhance the passenger flow handling speed of gate, extend the equipment life cycle. The project provides one-year maintenance services for the MTR and completed the transfer of the entire project in 2014.

 

The main transformation scope of the project includes the replacement of the processor circuit board in the gate (supplied by the original ERG), the upgrading to the computer module of the industrial grade, the module production assembly, the upgrading of the power supply, the configuration of the newly designed LCD display, configuration of non-interrupted power in the gate, replacement of the internal cable and so on.

 

In order not to affect the daily operation of the railway, the gate disassembly and installation work are arranged after the railway stops running until the next day before the station is open to public, thus the time is tight, task is heavy and demanding. After installation, the gate needs to be operating normally, passing operation test without affecting other equipment of the station, or there will be serious consequences. On the other hand, the MTR only allows a small number of spare gates to be replaced every night, so every night only a limited number of gates can be changed and transported to the factory for transformation and upgrading. The upgrading work must be completed in the day and repeatedly until all works are completed. As the Eastern Rail line has five different gates, the way to allocate the specific order presents huge challenge to implementation staff.

 

Through the transformation of the gate, BII HK gained valuable experience from the project design, production, procurement, assembly, site construction and project management and other links to provide reference for the future project bidding and implementation. MTR has always been known for its strictness. During the implementation of the project, the company actively communicated with the owners and successfully completed the transformation task. The transformation work has been highly appraised by the MTR.